/ Our Projects

Sharma Nesma

Sharma Nesma
2018
MEP
  • Acoustic insulation works for generator rooms within the Central Utility Unit.
  • Coverage of multiple facilities across the Sharma Palace complex, including the Primary. Substation, Data Center, Main Diwan, Clinic, and other service buildings.
  • Supply and installation of sound attenuators and exhaust silencers for generator systems.
  • Installation of motorized dampers for controlled airflow and noise reduction.
  • Application of 240m² rockwool acoustic lining for sound absorption.
  • Insulated exhaust piping to reduce noise transmission and improve system efficiency.
  • Full integration of noise control measures across power generation infrastructure.