/ Our Projects

King Fahd University of Petroleum and Minerals

King Fahd University of Petroleum and Minerals
Aug. 2022 - Sep. 2025
MEP
  • Engineered discharge and intake sound attenuators achieving ultra-low noise levels of 65dBA at 1m.
  • Designed and fabricated a 2,000-liter double-skin daily fuel tank with advanced safety provisions.
  • Executed comprehensive acoustic insulation using high-grade Rockwool panels and perforated GI sheets.
  • Supplied and installed critical mufflers, exhaust systems, and fresh air ducts — over 160 meters of precision-engineered piping with insulation and cladding.
  • Installed axial intake fans delivering 44,000 CFM airflow for optimized generator performance.
  • Designed and fabricated custom generator enclosure with integrated mufflers, access doors, and noise reduction to 85dBA.